Fans of Brighton & Hove Albion Football Club can now track the building progress of their new stadium at Falmer, near Brighton.
The camera located within the new stadium at Falmer is supplied by Lobster Pictures and has been installed on the site to capture time-lapse photography of the stunning new structure as it starts to take shape.
Using a custom-built portal, Seagulls fans can view an updated image from the site every 20 minutes.
A series of simple controls allow the viewer to zoom in and out, and pan around the image, as well as being able to view all the previous time-lapse pictures.
The new 22,500 capacity Falmer Stadium is due to be completed summer 2011, in time for the 2011–12 football season.